What is the projected health of the Great Salt Lake including elevation, toxic dust exposure, brine shrimp viability, and lake-effect precipitation at operational license end and at 100, 300, and 1,000 years post-shutdown, accounting for 8.97 gigawatts of continuous waste heat into a terminal basin with no thermal exit pathway, the 43-percent probability of a Wasatch Fault magnitude 6.75 seismic event within 50 years, and simultaneous cooling water loss and radiological release into the primary water supply of 80 percent of Utah's population and who is liable for the irreversible harm across the full decay timeline?
Governor Spencer J Cox Letter (pdf)
DownloadUtah Office of Energy Development Letter (pdf)
DownloadUtah Geological Survey Letter (pdf)
DownloadUtah Division of Water Resources Letter (pdf)
DownloadU.S. Fish & Wildlife Service Letter (pdf)
DownloadU.S. Army Corps of Engineers Letter (pdf)
DownloadRepresentative Blake Moore Letter (pdf)
DownloadNuclear Regulatory Commission Letter (pdf)
DownloadGreat Salt Lake Commissioner Letter (pdf)
DownloadFederal Emergency Management Agency Letter (pdf)
DownloadEnvironmental Protection Agency Letter (pdf)
DownloadDepartment of Environmental Quality Letter (pdf)
DownloadBureau of Land Management Letter (pdf)
DownloadDepartment of Energy, Office of Nuclear Energy Letter (pdf)
DownloadCopyright © 2025 UNofficialSLCMayor- All Rights Reserved.
A January Walker Project